Sleeping Essentials&Camping Lighting
Sleeping Essentials&Camping Lighting Sleeping Essentials&Camping Lighting
Home Gps Devices Waterproof Gps Device
Smartpaws GPS Pet Tracker – Real-Time Location, Safe Zone Alerts & Long Battery Life

Smartpaws GPS Pet Tracker – Real-Time Location, Safe Zone Alerts & Long Battery Life

$ 54.99

$ 0.00

Save: $

Color:
  • Black
  • Blue
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

Keep your furry friend safe with the Smartpaws GPS Pet Tracker – the smart way to track your pet in real-time. This lightweight and waterproof tracker uses advanced GPS, Wi-Fi, and cellular technology to pinpoint your pet’s location with incredible accuracy. Whether your pet is a curious cat or an adventurous dog, Smartpaws gives you peace of mind with live tracking, geofencing, and escape alerts.

  • 🌍 Real-Time GPS Tracking: Always know where your pet is – no more stressful searches.
  • 📱 Mobile App Control: Track and manage your pet’s location right from your smartphone.
  • 🔋 Long Battery Life: Up to 7 days on a single charge – perfect for everyday use.
  • 🌧️ Waterproof & Durable: Designed for all-weather adventures and rugged play.
  • 🛑 Safe Zone Alerts: Set virtual boundaries and get notified when your pet leaves a designated area.
  • 🔒 Secure & Reliable: Encrypted location data ensures your pet’s safety and your privacy.

Perfect for dogs and cats of all sizes, the Smartpaws GPS Pet Tracker gives you full control and visibility – wherever your pet roams.

Order now and experience worry-free pet parenting with Smartpaws.

You May Also Like

30'' Outdoor Elevated Dog Bed with Canopy, Raised Dogs Bed with Four Ice Pack, Breathable Cooling Dog Cot Beds Small Medium Size Dogs, Outdoor Pet Hammock Beds, Outside Pet Beds(Small)
30'' Outdoor Elevated Dog Bed with Canopy, Raised Dogs Bed with Four Ice Pack, Breathable Cooling Dog Cot Beds Small Medium Size Dogs, Outdoor Pet Hammock Beds, Outside Pet Beds(Small)

$ 24.00

$ 35.00

Save: $

GaRcan Inflatable Sleeping Mattress Outdoor Inflatable Sleeping Pad Inflatable Air Cushion Camping Mat with Pillow Air Mattress Sleeping
GaRcan Inflatable Sleeping Mattress Outdoor Inflatable Sleeping Pad Inflatable Air Cushion Camping Mat with Pillow Air Mattress Sleeping

$ 71.00

$ 157.00

Save: $

Sleeping Pads for Camping,Ultralight Inflatable Sleeping Pad for Camping with Pillow,Built-in Pump,Waterproof Nylon foror Camping, Backpacking, Hiking, Tent Mattress (Army Green)
Sleeping Pads for Camping,Ultralight Inflatable Sleeping Pad for Camping with Pillow,Built-in Pump,Waterproof Nylon foror Camping, Backpacking, Hiking, Tent Mattress (Army Green)

$ 25.99

Save: $

Garmin Alpha XL in-Vehicle Dog Tracking GPS Navigator, 10” Touchscreen, VHF Radio for 9-Mile Range, Tracks up to 20 Dogs, 64 GB Memory, Preloaded Maps, 18 Training Levels w/ Wearable4U Power Bank Bundle (010-03394-00)
Garmin Alpha XL in-Vehicle Dog Tracking GPS Navigator, 10” Touchscreen, VHF Radio for 9-Mile Range, Tracks up to 20 Dogs, 64 GB Memory, Preloaded Maps, 18 Training Levels w/ Wearable4U Power Bank Bundle (010-03394-00)

$ 1199.99

Save: $

RUPES D-A Coarse High Performance Coarse Cutting Foam Pad 2-Pack (6" Face, 5" Backing)
RUPES D-A Coarse High Performance Coarse Cutting Foam Pad 2-Pack (6" Face, 5" Backing)

$ 17.00

$ 21.00

Save: $

MIROZO Truck Air Mattress Bed for 6-6.5FT Full Size Short Beds, Inflatable Air Mattress with Air Pump for Outdoor Camping,Tent,Truck(Grey)
MIROZO Truck Air Mattress Bed for 6-6.5FT Full Size Short Beds, Inflatable Air Mattress with Air Pump for Outdoor Camping,Tent,Truck(Grey)

$ 54.00

$ 78.00

Save: $

Full Auto Electric Water Gun for Adults/Kids,Automatic Water Suction 300  Continuous Ammos,Powerful IP67 Waterproof Squirt Guns Up to 28-32FT Range(Red)
Full Auto Electric Water Gun for Adults/Kids,Automatic Water Suction 300 Continuous Ammos,Powerful IP67 Waterproof Squirt Guns Up to 28-32FT Range(Red)

$ 16.00

$ 20.00

Save: $

Insta360 Ace Pro AI 8K HDR Waterproof Magnetic Action Camera with Selfie Stick, GPS Preview Remote, Standard Mount, and Flexible Adhesive Mount, Extra Battery and GPS Remote Mount Kit
Insta360 Ace Pro AI 8K HDR Waterproof Magnetic Action Camera with Selfie Stick, GPS Preview Remote, Standard Mount, and Flexible Adhesive Mount, Extra Battery and GPS Remote Mount Kit

$ 210.00

$ 600.00

Save: $

Water Bed Cushion Ice Pad Dog Sleeping
Water Bed Cushion Ice Pad Dog Sleeping

$ 26.99

Save: $

Lampe de camping rechargeable LED | Batterie externe USB
Lampe de camping rechargeable LED | Batterie externe USB

$ 39.99

Save: $

Cart
Sleeping Essentials&Camping Lighting
Your cart is currently empty.